Two networks
- ESB Networks runs the distribution network: the local medium- and low-voltage lines and substations that connect homes, farms and businesses.
- EirGrid runs the transmission grid: 110 kV and above, the national backbone between large substations and power stations. Its plans are public because new lines need public consultation.
Reading ESB's capacity heatmap
ESB's heatmap lists around 46,000 substations, refreshed about every quarter, with their spare capacity for new demand (using electricity) and new generation (such as solar). ESB's own notes say:
- Low-voltage connections (under 500 kVA: homes, small businesses, farms) typically need a substation within about 300 m. Further than that, a new substation may be needed nearer the site, usually at the customer's cost.
- Medium-voltage connections (500 kVA and over) depend on the spare capacity at the parent high-voltage station.
- The figures are transformer capacity only, not the circuits upstream; they're first come, first served, and they're an indication to start a conversation, not a guarantee.
The locations of the larger high-voltage stations in the heatmap are only indicative.
What it can't tell you
- Whether a connection is possible, or its cost. Only an ESB Networks connection application answers that.
- Where the existing low-voltage lines run on or past the site. ESB doesn't publish them; ask ESB, or look for poles on the ground.
Sources
- ESB Networks: Available Capacity Heatmap, esbnetworks.ie
- EirGrid: Transmission Development Plan public map, eirgrid.ie
Last reviewed 2026-10-02.